Bay Area's Newest Express Lanes Opened Monday

Due to the high level of existing congestion, the Metropolitan Transportation Commission warns motorists that the new I-680 Contra Costa Express Lanes will offer relief just before and after the peak commute hour.

3 minute read

October 11, 2017, 2:00 PM PDT

By Irvin Dawid


Michael Cabanatuan of the San Francisco Chronicle reports on the new high occupancy toll (HOT) lanes through the San Ramon Valley in Contra Costa County, the first express lanes to be constructed and operated by the Bay Area's metropolitan planning organization, the Metropolitan Transportation Commission (MTC).

“This is not going to eliminate congestion in the 680 corridor,” said John Goodwin of MTC. “Absolutely expect it to relieve congestion, especially ... just before and after peak travel times. But during periods of consistently very heavy traffic, during the peak, the express lanes may not move the needle a great deal."

If traffic is so heavy that the express lanes come to a slow crawl, only carpools will be allowed into the lane until the flow improves.

The lanes, converted from existing carpool lanes, stretch 11-12 miles in each direction, and will operate as express (or HOT) lanes from 5 a.m.-8 p.m., Monday through Friday, unlike Northern Virginia's I-66 lanes which will open in December as "the first rush-hour-only, peak-period toll system of its kind in the United States," as noted here on Tuesday.

Carpools, clean air vehicles, and motorcycles continue to get break

Unlike the I-66 HOT lanes, though, "clean air vehicles" will continue to use the converted high occupancy vehicle (HOV) lanes toll-free provided they have the white or green decals and a FasTrak Flex toll transponder set in the 3+ position. Carpools also will continue to operate toll-free provided they have the flex toll transponder set in either the 2 or 3+ position. Motorcycles need the flex transponder as well.

Congestion pricing will apply, with a minimum of $.50 for each of the two sections of the roadway. A maximum toll has not been set.

Network is growing 

"With the addition of the 680 Contra Costa lanes, the Bay Area’s express lanes now cover 75 miles," adds Cabanatuan for The Chronicle. While these are the first lanes to be built and operated by the Bay Area Infrastructure Financing Authority, a joint powers authority between MTC and the Bay Area Toll Authority, other Bay Area express lanes fall under the authorities of the Santa Clara Valley Transportation Authority and the Alameda County Transportation Commission.

By 2035, regional transportation planners expect them to form a network that stretches 550 miles mostly in the East Bay and South Bay.

Coming next, in 2020, are express lanes on Interstate 880 between the southern tip of Oakland and Highway 237 in Milpitas and an extension of the Contra Costa lanes in the southbound direction to Marina Vista in Martinez [click on "Martinez to Walnut Creek" near the bottom of page].

Both of these projects are spearheaded by MTC. Click here for a map of the entire 550-mile Bay Area Express Lane network, with links to details for each corridor.

For more details on the I-680 Contra Costa Express Lanes, click on 511.org/driving/express-lanes/work.

Hat tip: AASHTO Daily Transportation Update.

Friday, October 6, 2017 in SF Gate

portrait of professional woman

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban Planner

Get top-rated, practical training

Close-up of "Apartment for rent" sign in red text on black background in front of blurred building

Trump Administration Could Effectively End Housing Voucher Program

Federal officials are eyeing major cuts to the Section 8 program that helps millions of low-income households pay rent.

April 21, 2025 - Housing Wire

Logo for Planetizen Federal Action Tracker with black and white image of U.S. Capitol with water ripple overlay.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

April 30, 2025 - Diana Ionescu

Close-up on Canadian flag with Canada Parliament building blurred in background.

Canada vs. Kamala: Whose Liberal Housing Platform Comes Out on Top?

As Canada votes for a new Prime Minister, what can America learn from the leading liberal candidate of its neighbor to the north?

April 28, 2025 - Benjamin Schneider

Washington

Washington State’s Parking Reform Law Could Unlock ‘Countless’ Acres for New Housing

A law that limits how much parking cities can require for residential amd commercial developments could lead to a construction boom.

May 1 - Streetsblog USA

Bluebird sitting on branch of green bush.

Wildlife Rebounds After the Eaton Fire

Following the devastation of the Eaton Fire, the return of wildlife and the regrowth of native plants are offering powerful signs of resilience and renewal.

May 1 - AP News

1984 Olympics

LA to Replace Inglewood Light Rail Project With Bus Shuttles

LA Metro says the change is in response to community engagement and that the new design will be ready before the 2028 Olympic Games.

May 1 - Newsweek

Urban Design for Planners 1: Software Tools

This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.

Planning for Universal Design

Learn the tools for implementing Universal Design in planning regulations.