It's not the only subway under construction in Los Angeles, or event the most famous (it doesn't have the PR ring of the "Subway to the Sea"), but the Regional Connector will provide a critical link through the heart of the city's downtown.

Thomas Curwen reports, with the aid of photography by Mel Melcon, on the ongoing construction of the Regional Connector in Downtown Los Angeles.
The article describes the experience of the workers on the project, setting the underground construction scene amidst all the important statistics on the size and scope of the project.
In 2021, commuters will follow their steps, barreling through an S-shaped tunnel — the $1.75-billion Regional Connector project — 1.9 miles out of Little Tokyo, north to Bunker Hill and west to 7th and Flower streets, a transit corridor that will link Long Beach to Azusa and Santa Monica to East L.A.
Much of the article is devoted to the work of the "moles" or "sandhogs"—the miners putting in the hard work on the project. Many come from far away countries, and those from the United States will often travel to other parts of the country and the world to find similar work. Richard McLane, chief mechanical engineer for the Regional Connector Project, is quoted in the article describing why the tunneling work is so addicting for the people who do it: "It’s like watching civilization in action. This is not a leaf spring for a Chevy Camaro that in 10 years will be in a junkyard. The work we do will last generations."
FULL STORY: Climb inside the massive tunnel 60 feet below downtown L.A.

Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

San Francisco's School District Spent $105M To Build Affordable Housing for Teachers — And That's Just the Beginning
SFUSD joins a growing list of school districts using their land holdings to address housing affordability challenges faced by their own employees.

The Tiny, Adorable $7,000 Car Turning Japan Onto EVs
The single seat Mibot charges from a regular plug as quickly as an iPad, and is about half the price of an average EV.

Seattle's Plan for Adopting Driverless Cars
Equity, safety, accessibility and affordability are front of mind as the city prepares for robotaxis and other autonomous vehicles.

As Trump Phases Out FEMA, Is It Time to Flee the Floodplains?
With less federal funding available for disaster relief efforts, the need to relocate at-risk communities is more urgent than ever.

With Protected Lanes, 460% More People Commute by Bike
For those needing more ammo, more data proving what we already knew is here.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Smith Gee Studio
City of Charlotte
City of Camden Redevelopment Agency
City of Astoria
Transportation Research & Education Center (TREC) at Portland State University
US High Speed Rail Association
City of Camden Redevelopment Agency
Municipality of Princeton (NJ)