Years of controversy and delay were in the rearview this week when the Obamas joined the governor of Illinois and the mayor of Chicago to break ground on the Obama Presidential Center .

"More than four years after leaving office, Barack Obama broke ground on Tuesday on his presidential center on the South Side of Chicago," reports Neil Vigdor.
The Obama Presidential Center has a had a tumultuous journey to the groundbreaking, navigating lawsuits, concerns about displacement of existing residents (among other planning and design controversies), and multiple design iterations.
Now, the final product is in view, and it promises to stand in stark relief compared with previous presidential libraries. Vigdor writes:
In a departure from similar projects recognizing former presidents, the center won’t actually be a presidential library. It won’t house Mr. Obama’s presidential papers, which will be digitized — a decision that has been a sore point for some presidential observers. Mr. Obama envisioned that the center would host concerts, cultural events, lectures, trainings and summits.
The Obama Presidential Center is expected to cost $830 million (up from an earlier estimate of $500 million) and take four years of construction to complete. Vigdor describes the architectural details of the center as follows:
A 235-foot “museum tower” will be the focal point of the center. Words taken from Mr. Obama’s 2015 speech marking the 50th anniversary of the civil rights demonstrations in Selma, Ala., will wrap around the tower’s exterior to create a sunscreen. The center will include a Chicago Public Library branch, a great lawn, a children’s play area, a fruit and vegetable garden, and a teaching kitchen.
Alice Yin provides local coverage of the groundbreaking, which was also attended by Illinois Governor J.B. Pritzker, Chicago Mayor Lori Lightfoot, and former First Lady Michelle Obama. Yin explores more of the hyperlocal angle:
Five years ago, then-President Barack Obama chose Chicago’s Jackson Park as the future site of his presidential center, stirring the South Side with the promise of long-overdue transformation and the distinction of being the place where the story of the nation’s first Black president and first lady is told.
FULL STORY: Obama Breaks Ground on Presidential Center in Chicago After Lengthy Discord

Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

Congressman Proposes Bill to Rename DC Metro “Trump Train”
The Make Autorail Great Again Act would withhold federal funding to the system until the Washington Metropolitan Area Transit Authority (WMATA), rebrands as the Washington Metropolitan Authority for Greater Access (WMAGA).

The Simple Legislative Tool Transforming Vacant Downtowns
In California, Michigan and Georgia, an easy win is bringing dollars — and delight — back to city centers.

The States Losing Rural Delivery Rooms at an Alarming Pace
In some states, as few as 9% of rural hospitals still deliver babies. As a result, rising pre-term births, no adequate pre-term care and "harrowing" close calls are a growing reality.

The Small South Asian Republic Going all in on EVs
Thanks to one simple policy change less than five years ago, 65% of new cars in this Himalayan country are now electric.

DC Backpedals on Bike Lane Protection, Swaps Barriers for Paint
Citing aesthetic concerns, the city is removing the concrete barriers and flexposts that once separated Arizona Avenue cyclists from motor vehicles.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Smith Gee Studio
City of Charlotte
City of Camden Redevelopment Agency
City of Astoria
Transportation Research & Education Center (TREC) at Portland State University
US High Speed Rail Association
City of Camden Redevelopment Agency
Municipality of Princeton (NJ)