Train to Denver Airport Threatened with Closure over Crossing Gate Woes

The Federal Railroad Administration is threatening to revoke the waiver that allows the A-Line to operate with flaggers at grade crossings unless the Regional Transit District presents a plan by mid-month to fix the crossing gate problems.

2 minute read

December 3, 2018, 10:00 AM PST

By Irvin Dawid


Grade Crossing

Jeffrey Beall / Flickr

"In a Nov. 15 letter made public this week, Robert Lauby, chief safety officer at the Federal Railroad Administration, called 'unacceptable' the Regional Transportation District’s ongoing failure to provide warning times at its crossings that are within federally mandated ranges," reports John Aguilar for The Denver Post.

See CBS4 newscast on the FRA notice with excellent video of the trains themselves as well as flaggers working at grade crossings.

The A-Line has operated under an FRA waiver ever since the line opened in April 2016 because of the crossing gate challenges, which revolve around difficulties deploying new wireless signaling technology along the 23-mile line. The gates generally close earlier and lift up later than federal standards require.

The most recent waiver granted by the FRA, which required that flaggers be present at every crossing to provide a safety backstop, was for five years and was granted in September 2017.

Just six months after the A-Line opened, the FRA threatened the RTD with its shutdown along with the B-Line, a 6.2 mile, two-station electrified commuter rail line to Westminster which opened in July 2016, over the crossings gate problem. A 90-day waiver was granted.

RTD's plans to correct the problem ran afoul with the Colorado Public Utilities Commission in September 2017. Labor costs for the flaggers who must perform traffic duty at the A Line's 11 at-grade crossing amounted to $6 million for the first year, paid by Denver Transit Partners (DTP), a public-private partnership that is building and operating the A-Line, B-Line and G-Line, an 11-mile, 8-station electrified commuter rail line that will go to Wheat Ridge.

The two entities have filed lawsuits against one another as the crossing gate issue has dragged out for more than two years and RTD leaders have expressed concern about how the ongoing problems with crossing gate technology are harming the agency’s reputation.

Notwithstanding the signaling problems at intersections, the A and B lines have achieved an on-time performance rate exceeding 97 percent according to DTP.

Hat tip to AASHTO Daily Transportation Update.

Thursday, November 29, 2018 in The Denver Post

portrait of professional woman

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban Planner

Get top-rated, practical training

Close-up of "Apartment for rent" sign in red text on black background in front of blurred building

Trump Administration Could Effectively End Housing Voucher Program

Federal officials are eyeing major cuts to the Section 8 program that helps millions of low-income households pay rent.

April 21, 2025 - Housing Wire

Logo for Planetizen Federal Action Tracker with black and white image of U.S. Capitol with water ripple overlay.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

April 30, 2025 - Diana Ionescu

Close-up on Canadian flag with Canada Parliament building blurred in background.

Canada vs. Kamala: Whose Liberal Housing Platform Comes Out on Top?

As Canada votes for a new Prime Minister, what can America learn from the leading liberal candidate of its neighbor to the north?

April 28, 2025 - Benjamin Schneider

Washington

Washington State’s Parking Reform Law Could Unlock ‘Countless’ Acres for New Housing

A law that limits how much parking cities can require for residential amd commercial developments could lead to a construction boom.

5 hours ago - Streetsblog USA

Bluebird sitting on branch of green bush.

Wildlife Rebounds After the Eaton Fire

Following the devastation of the Eaton Fire, the return of wildlife and the regrowth of native plants are offering powerful signs of resilience and renewal.

6 hours ago - AP News

1984 Olympics

LA to Replace Inglewood Light Rail Project With Bus Shuttles

LA Metro says the change is in response to community engagement and that the new design will be ready before the 2028 Olympic Games.

7 hours ago - Newsweek

Urban Design for Planners 1: Software Tools

This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.

Planning for Universal Design

Learn the tools for implementing Universal Design in planning regulations.