Olympia Draft Transportation Plan Zeroes in on Complete Streets, Bike Infrastructure

The city’s comprehensive plan update could signal a shift in transportation planning priorities to a more comprehensive approach that ensures safer roads for all users.

1 minute read

October 30, 2024, 11:00 AM PDT

By Diana Ionescu @aworkoffiction


Washington state capitol dome in Olympia, Washington.

The Washington state capitol in Olympia, Washington. | jakartatravel / Adobe Stock

The draft transportation section of Olympia, Washington’s proposed master plan update focuses on a Complete Streets approach that acknowledges the need to prioritize road safety for all types of road users.

Kameko Marquez explains the proposed changes in the Journal of Olympia, Lacey & Tumwater, noting that “The TMP also introduces a comprehensive ‘low-stress bike network,’ incorporating separated bike lanes on major roads and bike-friendly routes through quieter residential neighborhoods.” The plan calls for ensuring that all residents are within a quarter-mile of a designated bike route. In a meeting to discuss the plan, Olympia Planning Commissioners expressed support for additional bike infrastructure such as on-street bike corrals and e-bike charging stations.

Under the city’s Engineering Design and Development Standards (EDS), street projects are required to include sidewalks on both sides, as well as bike lanes on major roads. “Since 2023, the EDS standards have mandated that all new bike lanes must be either buffered or separated from vehicle traffic, a requirement that applies to both city-led and private development projects.” 

The draft plan calls for using traffic modeling to reduce traffic lanes where appropriate. Senior Planner Michelle Swanson explained that “recent traffic models suggest lane reductions can be effective when paired with enhanced bike lanes, allowing traffic flow to be maintained.”

Saturday, October 26, 2024 in Journal of Olympia, Lacey & Tumwater

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

The Chicago Avenue Bridge when it was open, a dark red bridge in front of downtown.

Chicago Avenue bridge construction delays enrages city leaders

The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.

November 1 - Block Club Chicago

People walk to a bus in Queens

NYC bus network redesign speeds up Queens buses

Rush routes have seen a 4.6% speed increase after the redesign.

November 1 - Mass Transit

A rendering of the California high speed rail Fresno station. Two escalators leading into the station are visible.

California High-Speed Rail Authority picks trainset manufacturer

The California High-Speed Rail Authority aims to start servicing passengers by 2033.

November 1 - Railway News