The new RapidRide G is King County Metro’s most ambitious BRT line to date.

Last weekend, King County Metro launched its newest bus rapid transit (BRT) line, the 2.8-mile RapidRide G.
As Ryan Packer explains in The Urbanist, “With 2.8 miles of dedicated bus lanes covering the most congestion-prone areas of the route around Downtown and First Hill, and with many of those bus lanes occupying the center lane of the road to keep motorists out of the way of coaches, the RapidRide G will be as close to a gold-standard bus rapid transit (BRT) line that Seattle has seen to date.”
The line will feature buses with doors on both sides to speed up boarding. “With estimated trip times between 14 and 16 minutes from First Avenue to Madison Valley, the G Line will offer significant time savings over a current bus trip on the corridor, which can take 20 to 30 minutes and require a transfer.”
Passengers using wheelchairs will have access to ‘quick-deploying’ ramps, while people with bikes will be able to bring them onto the bus itself without using exterior racks.
Packer notes that the project, which creates a brand new transit corridor, also included upgrades to sidewalks, streets, traffic signals, and a water main.
FULL STORY: Metro Launches RapidRide G, Seattle’s Most Ambitious Bus Rapid Transit Project

Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

Congressman Proposes Bill to Rename DC Metro “Trump Train”
The Make Autorail Great Again Act would withhold federal funding to the system until the Washington Metropolitan Area Transit Authority (WMATA), rebrands as the Washington Metropolitan Authority for Greater Access (WMAGA).

The Simple Legislative Tool Transforming Vacant Downtowns
In California, Michigan and Georgia, an easy win is bringing dollars — and delight — back to city centers.

The States Losing Rural Delivery Rooms at an Alarming Pace
In some states, as few as 9% of rural hospitals still deliver babies. As a result, rising pre-term births, no adequate pre-term care and harrowing close calls are a growing reality.

The Small South Asian Republic Going all in on EVs
Thanks to one simple policy change less than five years ago, 65% of new cars in this Himalayan country are now electric.

DC Backpedals on Bike Lane Protection, Swaps Barriers for Paint
Citing aesthetic concerns, the city is removing the concrete barriers and flexposts that once separated Arizona Avenue cyclists from motor vehicles.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Smith Gee Studio
City of Charlotte
City of Camden Redevelopment Agency
City of Astoria
Transportation Research & Education Center (TREC) at Portland State University
US High Speed Rail Association
City of Camden Redevelopment Agency
Municipality of Princeton (NJ)