Another, Final(?) Delay for Alaskan Way Viaduct Replacement

The Washington Department of Transportation announced that Seattle's Alaskan Way Viaduct will close permanently in January 2019, with service switching over the tunnel Bertha built. The previous plan expected the switch to occur in the Fall.

1 minute read

September 19, 2018, 10:00 AM PDT

By James Brasuell @CasualBrasuell


Alaskan Way Viaduct

vewfinder / Shutterstock

The Associated Press breaks the news of a final delay for the Alaskan Way Viaduct, when state transportation officials announced a January 11, 2019 target date for the permanent closure of the Alaskan Way Viaduct.

When the plan to build a tunnel to replace the viaduct was announced in 2009, the target date for the closure was in December 2015.  The main reason for the long delay, of course, was the challenges that faced the tunnel boring machine named Bertha.

Tuesday, September 18, 2018 in Associated Press via Tri City Herald

portrait of professional woman

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban Planner

Use Code 25for25 at checkout for 25% off an annual plan!

Logo for Planetizen Federal Action Tracker with black and white image of U.S. Capitol with water ripple overlay.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

June 4, 2025 - Diana Ionescu

White and yellow DART light rail train in Dallas, Texas with brick building in background.

DARTSpace Platform Streamlines Dallas TOD Application Process

The Dallas transit agency hopes a shorter permitting timeline will boost transit-oriented development around rail stations.

May 28, 2025 - Mass Transit

AI-generated image of high-speed rail trail in elevated track in green hilly farmland.

Four Reasons Urban Planners Can’t Ignore AI

It’s no longer a question of whether AI will shape planning, but how. That how is up to us.

May 28, 2025 - Tom Sanchez

Close-up of red Amtrak Borealis train at station.

Amtrak’s Borealis Exceeds First Year Ridership Expectations

205,800 passengers have boarded the St. Paul to Chicago line, well above initial MDOT projections.

15 minutes ago - Minneapolis Star-Tribune

Line of multi-colored big rig trucks drivign down highway with other traffic including a yellow school bus.

Study: 4% of Truckers Lack a Valid Commercial License

Over 56% of inspected trucks had other violations.

June 4 - FreightWaves

Pedestrian holding visual impairment cane pressing crosswalk button.

Chicago Judge Orders Thousands of Accessible Ped Signals

Only 3% of the city's crossing signals are currently accessible to blind pedestrians.

June 4 - DRA Legal

Urban Design for Planners 1: Software Tools

This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.

Planning for Universal Design

Learn the tools for implementing Universal Design in planning regulations.