According to an assessment of two North Carolina pilot projects, low-speed autonomous shuttles have too many limitations to deploy as a public transit option.
Skip Descant, writing for Government Technology, shares details of a new report that assessed two North Carolina pilot programs testing low-speed autonomous vehicles. The conclusion? The vehicles still have “too many limitations” to be effective as transit solutions, including difficulty managing urban traffic settings and slow speeds that top out at about 12 miles per hour.
“These are some of the findings in a July 2024 report on the use of the autonomous vehicle (AV) shuttles by the North Carolina Department of Transportation (NCDOT). The study examined the use of the vehicles in the city of Cary and at the University of North Carolina (UNC) in Charlotte. Both pilot projects were part of the Connected Autonomous Shuttle Supporting Innovation (CASSI) program,” Descant reports. The two pilots used shuttle technology from Navya Autonom, a French company, and the shuttles were operated by Beep, a Florida-based company.
Despite these less than encouraging results, NCDOT plans to continue into the next phase of the CASSI program, which “could lead the agency to test autonomous systems embedded into more conventional vehicles,” similar to a project in Florida set to begin later this year. Beep and the Jacksonville Transportation Authority will test “14 customized Ford shuttles equipped with Level 4 autonomous technology, capable of traveling up to 37 miles per hour,” according to the Government Tech article.
Read the full story: Small AV Shuttles Not Yet Suitable for Transit Operations
Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.
California plans to bury El Niño’s downpour
If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.
Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River
Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.
Chicago Avenue bridge construction delays enrages city leaders
The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.
NYC bus network redesign speeds up Queens buses
Rush routes have seen a 4.6% speed increase after the redesign.
California High-Speed Rail Authority picks trainset manufacturer
The California High-Speed Rail Authority aims to start servicing passengers by 2033.
FREE Course: Walkable City 1: Why Walkability?
After describing his path towards focusing on walkability as the essence of good planning, Jeff Speck marches through his five principal reasons for making more walkable places.
Reinventing Malls: Planning Alchemy—Turning Gray Fields Into Gold
The course focuses on the opportunities and imperatives that shape reinvention of mall sites.
City of Rosemead
Rutgers University, Edward J. Bloustein School of Planning and Public Policy
One Hundred Miles
Hunter College, City University of New York (CUNY)
The Architects Foundation
University of Cincinnati Online
City of Cambridge
Montrose County
The Pocatello Development Authority