It' down to two options for a rail transit connection over the Sepulveda Pass, following the path of Interstate 405 between the San Fernando Valley and the Westside of Los Angeles.

The Los Angeles County Metropolitan Transportation Authority (Metro) has narrowed down the options for a rail transit along Interstate 405 through the Sepulveda Pass in Los Angeles.
Steven Sharp shares the details included of a staff report scheduled for release on February 18 that recommends funding for two competing contractors to begin pre-development work. A $63.6-million contract would fund work by LA SkyRail Express to study a monorail concept for the route. A $69.8-million contract would fund Sepulveda Transit Corridor Partners – Bechtel to study a heavy rail system across the pass.
Both proposals would run on aerial tracks for sone or all of the route, though the Bechtel proposal would also include a tunnel for a portion of the route.
The staff report reduces the number of potential alternatives for the route from four to two. Sharp has been following closely the evolution of the plans for the highly anticipated capital investment, including articles in January and July of 2019. Planetizen last picked up the news about the project in January 2019, when much of the media discussion about the project focused on the engineering challenges of routing a rail line across the Sepulveda's steep grades and wealthy enclaves. A collection of existing and planned transit projects awaits on either side of the pass. The Metro D Line (née Purple Line) is expending heavy rail subway service from Koreatown deep into the Westside. In the San Fernando Valley, the East San Fernando Light Rail line is expected to start construction in 2022.
Click through to the source article to see renderings of the two remaining concepts.
FULL STORY: How to connect the San Fernando Valley and the Westside

Rethinking Redlining
For decades we have blamed 100-year-old maps for the patterns of spatial racial inequity that persist in American cities today. An esteemed researcher says: we’ve got it all wrong.

Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

Walmart Announces Nationwide EV Charging Network
The company plans to install electric car chargers at most of its stores by 2030.

EPA Awards $267 Million to Clean Up and Reuse Contaminated Sites
The EPA is investing the funds to clean up and redevelop contaminated sites nationwide, supporting economic growth, community revitalization, and environmental restoration.

Knoxville Dedicates $1M to New Greenway
The proposed greenway would run along North Broadway and connect to 125 miles of existing trails.

Philadelphia Launches ‘Speed Slots’ Traffic Calming Pilot
The project focuses on a 1.4-mile stretch of Lincoln Drive where cars frequently drive above the posted speed limit.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
City of Moorpark
City of Tustin
City of Camden Redevelopment Agency
City of Astoria
Transportation Research & Education Center (TREC) at Portland State University
Regional Transportation Commission of Southern Nevada
Toledo-Lucas County Plan Commissions