Randal O’Toole’s recent policy study from the Cato Institute, “Roadmap to Gridlock” is s worthy read for all professional planners, no matter what their ideological or professional stripe. Undoubtedly, most planners probably consider someone who maintains a blog called the “Antiplanner” more of a bomb thrower than a serious policy analyst. But this dismissive attitude throws an awful lot of good work by the road side, and a good example of that is O’Toole’s “Roadmap to Gridlock.”
Randal O'Toole's recent policy study from the Cato Institute, "Roadmap to Gridlock" is s worthy read for all professional planners, no matter what their ideological or professional stripe. Undoubtedly, most planners probably consider someone who maintains a blog called the "Antiplanner" more of a bomb thrower than a serious policy analyst. But this dismissive attitude throws an awful lot of good work by the road side, and a good example of that is O'Toole's "Roadmap to Gridlock."
O'Toole, for those willing to go beyond the oped tag line, is no stranger to planning. Before leaping into urban planning and transportation in the mid-1990s, he was a leading figure in the reforming public lands management. He made a career out of reviewing, updating, and revising plans for forests and public lands, and had a respected national reputation for his work. "Roadmap to Gridlock" then should be of more than passing interest to professional planners.
For those with thin skins, go directly to pages 7-13 on "Procedural Problems with Transportation Plans." This section should be required reading in every planning course, whether it focuses on transportation planning or not. The reason is simple: O'Toole conducts sound research on how planning works in reality. He examined the actual planning process for 77 long range transportation plans, including the nation's largest urban areas. (See table 1 on page 15 for his complete list.) And his results are not pretty or encouraging for those who continue to adhere to the rational planning model. They certainly don't conform to the approach we (including yours truly) were/are taught in graduate school. (My Ph.D. is in public administration with concentrations in urban planning and public finance.)
O'Toole posits 10 non-controversial elements of a rational planning process and how planning is supposed to work, including
- The importance of measurable outputs and outcomes, not inputs
- Sensitivity analysis to assess the relevance of different plans
- Cost-benefit analysis for potential projects
- A "preferred alternative" that balances various criteria
- Public consultation to create transparency
- Monitoring and feedback of plan implementation
How well did transportation planning do? Poorly would be charitable. "None of the plans come close to the [10 element] rational process described above or even the more basic process defined by the Bureau of Public Roads in 1963," he writes.
"No plan did sensitivity analyses of critical assumptions. None bothered to project potential benefits or cost-effectiveness or projects considered. All but a handful of plans failed to include any realistic alternatives, and many failed to project the effects of the proposed plan on transportation. As a result, plans lacked transparency: taxpayers and other readers of most plans would have no idea how to projects were selected, whether those projects or the plans themselves were cost effective at meeting plan goals, or even, in many cases, whether the plans met any goals."
A harsh assessment, to be sure. Unfortunately, I've read my share of transportation plans for my book The Road More Traveled, as well as dozens of land use plans, and nothing Randal says in this study is inconsistent with my own direct (or analytical) experience with planning on the ground level.
Moreover, and perhaps even more telling, much of the criticism Randal levies at transportation planning is relevant to the broader field of planning. Like many visiting this web site, we have our own "horror stories" of the comprehensive plan, zoning map, or other regulatory tool that failed to reach even basic thresholds of the rational planning model we are taught in graduate school.
Of course, this reflects that fact that planning, in the end, is a political process, not a pure bureaucratic one. Even if planning were bureaucratic, O'Toole's assessment of the real world process suggests we simply don't have the information, resources, and knowledge of the complex way our urban regions work to make the rational model work anyway. Failure is not necessarily a byproduct of intent, but a reflection of the realities of attempting to plan complex human systems.
The issue I believe the urban planning profession has to grapple with is how to rethink the role of public planning given the inevitably political and politicized environment in which it occurs. This is one reason why I've argued for scaling back both expectations and the scope of public sector planning so that it can be more focused, strategic, and realistic about what it can accomplish in the public realm.
You may not like the messenger, but it's pretty hard to dismiss the cold hard facts. While most planners will not agree with O'Toole on what remains in "Roadmap to Gridlock," they ignore his analysis of the realities of transportation planning (and planning more generally) at their own professional peril.
Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.
Northwest rail fans eager for Sept. 30 debut of Amtrak’s Airo fleet
Get ready for that new train smell and more seats. But they won’t go faster or run more frequently on the Cascades route in Washington and Oregon.
Trump is considering data centers on 6 states' public land — some state officials say they had no idea
If the administration approves the proposed projects, data center and data center-related developments will cover 17,600 acres of public land.
California may destroy its beaches trying to save homes from El Niño
Boulders and seawalls can protect homes from waves, but ultimately destroy sandy beaches.
California high-speed rail accomplishes only one legislative goal in 2026
The majority of the agency's failed pitches were never developed into written proposals.
Sharp cuts to federal passenger rail, public transit funding arrive today
The American Public Transportation Associations estimates the stopgap bill will result in an over 80% cut to federal passenger rail investment and 20% cut to public transit investment.
FREE Course: Walkable City 1: Why Walkability?
After describing his path towards focusing on walkability as the essence of good planning, Jeff Speck marches through his five principal reasons for making more walkable places.
Reinventing Malls: Planning Alchemy—Turning Gray Fields Into Gold
The course focuses on the opportunities and imperatives that shape reinvention of mall sites.
City of Thousand Oaks
City of Wisconsin Rapids
Harvard University Graduate School of Design
The Architects Foundation
University of Cincinnati Online
Northern Illinois Transit Authority (NITA)
The Pocatello Development Authority
The Urban Renewal Agency of the City of Pocatello