New Study Commissioned for Atlanta BeltLine Transit

The study will assess alignment options for a 13-mile segment of the greenway.

1 minute read

September 12, 2023, 7:00 AM PDT

By Diana Ionescu @aworkoffiction


Aerial view of Atlanta BeltlLine greenway with yellow umbrellas

Aerial Stock Footage / Adobe Stock

Atlanta BeltLine Inc. has launched a two-year study to assess the potential for transit options and station locations that would serve over 13 miles of the 22-mile urban trail, reports Josh Green in Urbanize Atlanta. The study will be conducted by engineering firm Kimley-Horn & Associates. According to BeltLine president and CEO Clyde Higgs, transit is a keypart of the project’s mission. “The BeltLine is about high-quality ways to connect people to jobs, healthcare, shopping, education, and opportunity while making Atlanta a more mobile city”

Green adds, “The goal of the study is to determine the preferred alignment for BeltLine transit—and to pinpoint the best locations for stations—in a section near the BeltLine called the northwest quadrant, stretching from the Westside near MARTA's Bankhead station up to southern Buckhead.”

The study is tasked with focusing specifically on connecting the growing regional trails network and  transit system and making the BeltLine more accessible to more residents. “Kimley-Horn’s work is expected to cover field investigation for new transit, consolidation of previous studies, ridership forecasting, financial planning, environmental screening, stakeholder and public outreach, and equity considerations, among other aspects.”

Monday, September 11, 2023 in Urbanize Atlanta

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

A pencil rendering of Foundry Park, which shows skyscrapers and public green spaces.

Chicago breaks ground on $3 billion megadevelopment

The new neighborhood, titled Foundry Park, will one day host 3,700 residences.

October 23, 2026 - Chicago Sun Times

A swamp in South Carolina with tall pale trees and Spanish moss in the water.

Satanic Place Names

From streams and lakes to valleys and canyons, I mapped more than 1,000 places named after the Devil.

1 hour ago - The Daily Yonder

A rendering of a high speed rain station in California, with wide platforms and a sleep train with yellow highlights.

California High-Speed Rail Authority CEO resigns after $600,000 scandal

Under Ian Choudri, the authority used taxpayer dollars to fund first class flights and trips to nightclubs.

October 30 - Cal Matters

 A bridge stretches across the Missouri River at Chamberlain, South Dakota.

Want to study the Missouri River? Soon, you may need unanimous approval from 10 states

Legislation would require 10 governors’ permission to study or build projects moving water outside the basin.

October 30 - South Dakota Searchlight