Development Synergy Pushing Buildings to Record Heights in Nashville

A development proposed for a site adjacent to the buzzy Nashville Yards will set a new record height for the city of Nashville.

1 minute read

October 14, 2021, 7:00 AM PDT

By James Brasuell @CasualBrasuell


An image of Downtown Nashville with the Cumberland River at dusk.

f11photo / Shutterstock

A proposed development will become the tallest building in Nashville, replacing the AT&T Building, completed in 1994, at the top of the city's skyline.

An article by Jonathan Hilburg reports on the proposed 100,000-square-foot, 60-story residential tower planned for a .9-acre property on Church Street, currently home to the YMCA of Middle Tennessee.

In addition to surpassing the height of the AT&T Building, the proposed development will also provide a more modern, according to Hilburg.

"Renderings for the new tower, designed by the Chicago-based Goettsch Partners, show a pleated glass curtain wall that terminates at a crystalline peak backed by a flat wall of glass. The residential tower portion will reportedly hold 500 units total with a mixture of condo units and apartments."

The development is being planned for a lot across the street from the 17-acre Nashville Yards—"a sprawling office and tech campus that has already drawn in major commitments from Amazon to bring 5,000 employees to the city (and two new office towers currently under construction)."

The source article includes renderings of the planned high-rise development.

Thursday, October 7, 2021 in The Architect's Newspaper

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

The Chicago Avenue Bridge when it was open, a dark red bridge in front of downtown.

Chicago Avenue bridge construction delays enrages city leaders

The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.

November 1 - Block Club Chicago

People walk to a bus in Queens

NYC bus network redesign speeds up Queens buses

Rush routes have seen a 4.6% speed increase after the redesign.

November 1 - Mass Transit

A rendering of the California high speed rail Fresno station. Two escalators leading into the station are visible.

California High-Speed Rail Authority picks trainset manufacturer

The California High-Speed Rail Authority aims to start servicing passengers by 2033.

November 1 - Railway News