The high-speed rail line will link Las Vegas and the Los Angeles area.

The Brightline West high-speed rail (HSR) line between Las Vegas and Southern California broke ground last week, with trains scheduled to begin operating by 2028, when Los Angeles hosts the Summer Olympics, reports Ken Ritter for the Associated Press.
The 218-mile rail line will connect passengers to Southern California’s commuter rail system, Metrolink, in Rancho Cucamonga, with a stop in the Victorville area. The line will be built primarily in the median of Interstate 15. The project received $3 billion in federal funding last December and has earned high praise from federal transportation officials.
Brightline, which already operates a train line between Miami and Orlando in Florida, plans to expand to other regions. Brightline West will be the nation’s first ‘true’ high-speed passenger rail line and will make the trip in just over two hours.
FULL STORY: Work starts on bullet train rail line from Sin City to the City of Angels ***AP article

Planetizen Federal Action Tracker
A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

Congressman Proposes Bill to Rename DC Metro “Trump Train”
The Make Autorail Great Again Act would withhold federal funding to the system until the Washington Metropolitan Area Transit Authority (WMATA), rebrands as the Washington Metropolitan Authority for Greater Access (WMAGA).

The Simple Legislative Tool Transforming Vacant Downtowns
In California, Michigan and Georgia, an easy win is bringing dollars — and delight — back to city centers.

The States Losing Rural Delivery Rooms at an Alarming Pace
In some states, as few as 9% of rural hospitals still deliver babies. As a result, rising pre-term births, no adequate pre-term care and harrowing close calls are a growing reality.

The Small South Asian Republic Going all in on EVs
Thanks to one simple policy change less than five years ago, 65% of new cars in this Himalayan country are now electric.

DC Backpedals on Bike Lane Protection, Swaps Barriers for Paint
Citing aesthetic concerns, the city is removing the concrete barriers and flexposts that once separated Arizona Avenue cyclists from motor vehicles.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
Smith Gee Studio
City of Charlotte
City of Camden Redevelopment Agency
City of Astoria
Transportation Research & Education Center (TREC) at Portland State University
US High Speed Rail Association
City of Camden Redevelopment Agency
Municipality of Princeton (NJ)