Op ed: if transit agencies want sustainability, they should focus on their buildings

In the Washington region, buildings can account for nearly 70% of greenhouse gas emissions. If WMATA wants to be a sustainable agency, it must upgrade its developments as well as its transit.

4 minute read

October 15, 2026, 5:00 AM PDT

By Linda Cui

A rendering of WMATA's new building, which has many windows and two levels that don't appear to have walls.

At WMATA's North Bethesda building, envisioned as a life sciences-anchored hub, waste heat from a lab building could provide heating to adjacent multifamily apartments, reducing the utility costs for both. | WMATA

This story was originally published on Greater Greater Washington.

Washington Metropolitan Area Transit Authority selected a developer for the next phase of a 1.9 million square foot mixed-use project at North Bethesda station in May 2025, and the terms that will shape construction are still under negotiation.

As it stands, those terms don’t preserve the option for buildings within the development to share energy infrastructure. They should, and WMATA has the power to make it happen.

Such a setup would reduce emissions and lower energy usage. The cost of not acting is real: Every new building connected to fossil fuel infrastructure today passes higher bills on to future tenants and owners and risks locking the site out of a transition the industry is already making.

A rendering of WMATA's building that shows people walking around outside of it.
A rendering of WMATA's proposed building in North Bethesda. | WMATA 

Buildings pose a big, solvable emissions challenge

WMATA’s sustainability goals are built around reducing transportation emissions, but in the Washington region, buildings account for 50% to nearly 70% of greenhouse gas emissions. Transit-oriented developments may reduce driving, but the buildings themselves are where the decarbonization challenge actually lives – and where planning for shared energy infrastructure upfront is key.

Fortunately, the elements that make a successful TOD, such as high density, optimized ground floors and a mix of uses, also lend themselves to shared energy infrastructure. For example, at North Bethesda, envisioned as a life sciences-anchored hub, waste heat from a lab building could provide heating to adjacent multifamily apartments, reducing the utility costs for both.

The physical conditions are favorable for shared energy infrastructure, but the structure that governs TODs is not. TODs are planned at the master plan level, but delivered in phases, over years, as financing and market conditions allow. Conventional district energy, with a central plant serving many buildings, requires high upfront cost, coordinated ownership, and a commitment to substantial build-out from the start. That’s fundamentally incompatible with phased delivery.

Another shared energy set-up could work, however: Ambient temperature thermal energy networks start at the scale of a single building, don’t depend on a central plant, and retain value whether or not later phases happen on schedule. The cost of shared infrastructure gets spread across many users over time, and incremental deployment is a financial advantage rather than a liability.

Who is responsible for shared energy infrastructure?

At North Bethesda, control is divided three ways: WMATA owns the land, Hines builds the buildings and Montgomery County funds the public realm. No single party has both the authority and the incentive to act on shared energy infrastructure. It falls between the mandates.

A rendering of WMATA's proposed building in North Bethesda. | WMATA 

You can see this in the North Bethesda project’s governing documents. The memorandum of understanding between WMATA and Montgomery County centers on life sciences development, transit ridership, real estate revenue and new tax revenue from currently tax-exempt land. Sustainability and energy infrastructure aren’t among the goals.

And the funding is already stretched: Even with $96.6 million committed in county and state money, the agreement notes a remaining gap of $12.3 million for streets, sidewalks, utilities and open space alone. Every public dollar is already directed toward the infrastructure that unlocks private development. There’s no line item for shared energy systems, because the framework was never designed to produce one.

WMATA can and should take charge

I’m proposing a low-cost, high-value intervention within WMATA’s existing authority: WMATA joint development agreements and requests for proposals should include language that preserves the option for future shared energy infrastructure.

For North Bethesda, that means language in the JDA that is still being negotiated. For every station that follows, it means language in the solicitation. WMATA controls both. I emailed WMATA to see if the agency has considered incorporating a requirement like this into either this JDA or any other projects, but didn’t hear back.

Implementing that language would mean commissioning a feasibility study once, mapping where shared energy infrastructure could go, and including those corridors as a design constraint in the existing conditions every developer already works from. Reserving that space is far more economically responsible than a retrofit down the line: It’s a planning designation, like any other site constraint.

Other cities have shown this is possible within existing authority. Boston’s Smart Utilities program requires developers of projects over 1.5 million square feet to complete a feasibility study on advanced energy systems (which can include district thermal networks) as part of the standard development review process. No new legislation. No new mandate. A planning agency used its existing development review authority to make energy infrastructure a design parameter from the start.

Renderings of Boston's PLAN: South Boston Dorchester Avenue, which was the primary test case for Boston's Smart Utilities program. | Arcgis

North Bethesda Phase 5 is 1.9 million square feet. What’s proposed here — preserving the subsurface space so that assessment can happen later — is less than what Boston already requires as standard practice.

The time is now

At North Bethesda, the cost of inaction is high, the authority already exists, and the window for requiring shared energy infrastructure is open until the JDA is signed.

In addition, the regulatory environment is moving faster than the procurement process: For most of WMATA’s portfolio, which is within the District, new buildings will face net-zero energy requirements under the Clean Energy DC Building Code Amendment Act, with regulations due by the end of 2026. Buildings connected to fossil fuel systems today are using infrastructure that may be noncompliant before the decade is out.

The moment to treat energy infrastructure as a foundational design parameter, alongside streets, station access, and public space, is before – not after – key development decisions are locked in.

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 14, 2026 - Zachary Whalen

A crane lifts a manufactured house, with is rectangular and does not yet have a roof.

HUD modernizes 50-year-old manufactured housing framework

The Next Generation Manufactured Housing Action Plan establishes new energy-efficiency standards for manufactured homes, and new guidelines for anchoring them.

October 8, 2026 - Boston Real Estate Times

Cars driving under automatic congestion pricing toll machines on Broadway next to the Trump International Hotel in Manhattan, New York City.

Data reveals that NYC’s bet on congestion pricing has paid off

After almost two years of the program, reports show positive impacts on traffic and air quality and no disruptions to parking.

October 13, 2026 - Marcelo Remond

Construction of a natural gas pipeline.

Developers sue Mississippi landowners who object to pipeline through their land

Because the Federal Energy Regulatory Commission approved the pipeline project, the developer can use private land without the consent of the owner.

15 minutes ago - Mississippi Today

Pedestrians in NYC cross the street.

A gas leak in NYC is costing residents $300 million

More than 90% of NYC’s electricity is from natural gas. About 2% of that gas is leaking and escaping into the air.

1 hour ago - Gothamist

Drone photo of dam on upper Otay Lakes Reservoir. It is covered in graffiti.

CA officials have the power to fix the state’s riskiest dams. They’ve never used it

California’s 40 most hazardous dams would endanger up to 1.5 million people if they failed.

2 hours ago - Cal Matters