The Population Vs. Conservation Race

By 2100, there will be 10 billion people on Earth. The only way we will live comfortably is with energy-saving technology.

1 minute read

June 21, 2002, 5:00 AM PDT

By Chris Steins @planetizen


"The happy news comes when we combine limited population with conservation growth. The conservation bomb wins. Rosenfeld points out that at 2 percent growth—the 2 percent solution—conservation outruns population by a large factor. Two percent compounded over 100 years reduces energy use by a factor of 7.2. By 2100, with a world population of 10 billion people, everyone can be living at the current European standard of living and yet expending half the energy we are using today."

Thanks to MIT Technology Review Editor

Wednesday, June 19, 2002 in Technology Review

A highway in Washington state.

Washington state to charge fee to drivers with fuel-efficient cars

Revenue from the fee will go towards supporting the state’s highways.

November 17, 2026 - The Urbanist

A rendering of the proposed computing campus and data center, an aerial shot of three rectangular, gray buildings and smaller square, white ones.

Illinois considers spending $1 billion in taxpayer money on data center

A quantum computing campus and data center are currently under construction in Chicago.

November 17, 2026 - Block Club Chicago

A canyon wall filled with engravings of animals and people.

Trump to blast ‘hydrocarbon highway’ through ‘world’s longest art gallery’

Environmental and historic preservation groups are suing to stop the project.

November 22, 2026 - Grist

Alaska railroads train approaches the camera. The train is blue and yellow.

Data center, mining project swarm to long-awaited Alaska railroad line

The state-owned railroad approved final plans for the spur line this week; the project is expected to cost $311 million, mostly funded by the federal government

45 minutes ago - Alaska Beacon

The Iowa Army Ammunition Plant in Middletown, Iowa. A red sign behind a fence has the name of the location. Behind it, grass and buildings.

U.S. Army plan to explode reactive lead waste in Iowa postponed indefinitely

The Army will detonate the lead inside underground concrete chambers.

1 hour ago - The Washington Post

Two cranes help construct a data center in the middle of the desert.

Data centers may drain 4 billion gallons of water annually from U.S.’s driest state

Nevada already has three dozen data centers; several dozen more are planned.

2 hours ago - Facilities Dive

FREE Course: Walkable City 1: Why Walkability?

After describing his path towards focusing on walkability as the essence of good planning, Jeff Speck marches through his five principal reasons for making more walkable places.

Reinventing Malls: Planning Alchemy—Turning Gray Fields Into Gold

The course focuses on the opportunities and imperatives that shape reinvention of mall sites.