Historic Preservation And The NFL

A $500 million plan to redesign and preserve the 81-year old Pasdena Rose Bowl is part of attempt to lure an NFL franchise to Los Angeles.

1 minute read

April 23, 2003, 12:00 PM PDT

By Chris Steins @planetizen


"Rose Bowl officials, convinced they can soothe powerful Pasadena historical preservationists while meeting the needs of a modern NFL team, unveiled plans Tuesday for a $500-million reconstruction project aimed at bringing pro football back to the Los Angeles area... The design essentially would preserve the landmark shell of the stadium while reconfiguring the interior."

Thanks to Chris Steins

Wednesday, April 23, 2003 in The Los Angeles Times

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

A construction crew working on SunZia.

How a Chicago-sized wind farm beat the odds and powered on

The project spanned five presidential administrations and a standoff with a U.S. military base.

30 minutes ago - Grist

A rendering of the basketball court, a green court under a blue sky.

MTA gives itself 30 days to transform pit into basketball court

The site has been under construction since 2022; the city originally estimated it would finish the court in 2024.

1 hour ago - Gothamist

A crowd of people bathed in pink light in front of a stage.

Non-stop party: Chicago voters weigh permanent festival grounds

A stable place for bleachers, stages and drainage may streamline the setup and teardown of large events.

2 hours ago - Block Club Chicago