City Hires New Firm To Revise Downtown Plan By Duany

West Palm Beach City Commission selects new firm to revise the City's Downtown Master Plan, based on form driven code authored by Duany-Plater Zyberk in 1996, with new, guideline driven code.

1 minute read

November 8, 2005, 8:00 AM PST

By Abhijeet Chavan @http://twitter.com/legalaidtech


West Palm Beach City Commission selected a new firm to revise the City's Downtown Master Plan, authored by Duany-Plater Zyberk in 1996. The selected firm, Zyscovich, Inc. "challenged commissioners to embrace new building forms and to write more specific guidelines, in some cases specifying on a block-by-block basis how buildings should look.", in contrast to the former plan by New Urbanism pioneers Duany-Plater Zyberk relied on creating "a simple code with a few simple building forms aimed at creating pedestrian-friendly streets".

By hiring a new firm with a different philosphy, the City acknowledged that their plan was no longer adequate to the growing needs of their downtown.

Thanks to Melissa Hege

Tuesday, November 8, 2005 in Palm Beach Post

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

The Chicago Avenue Bridge when it was open, a dark red bridge in front of downtown.

Chicago Avenue bridge construction delays enrages city leaders

The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.

November 1 - Block Club Chicago

People walk to a bus in Queens

NYC bus network redesign speeds up Queens buses

Rush routes have seen a 4.6% speed increase after the redesign.

November 1 - Mass Transit

A rendering of the California high speed rail Fresno station. Two escalators leading into the station are visible.

California High-Speed Rail Authority picks trainset manufacturer

The California High-Speed Rail Authority aims to start servicing passengers by 2033.

November 1 - Railway News