Tallest Skyscraper in 30 Years Proposed in Midtown Atlanta

If approved, a 61-story tower would be the tallest built in Atlanta in three decades.

1 minute read

November 11, 2021, 5:00 AM PST

By Diana Ionescu @aworkoffiction


Aerial view of downtown Atlanta, Georgia

Alessio / Adobe Stock

Josh Green reports on new plans presented to Atlanta's Midtown Development Review Committee that propose building the city's tallest skyscraper in 30 years on the site of a U.S. Post Office building and parking lot recently purchased by the developer, Rockefeller Group. The 61-story tower would have 350 residential units, 212,000 square feet of office space, and 6,600 square feet of retail.

Elsewhere plans call for a two-story bike room, and a curb cut along 12th Street that project leaders want to widen from 24 to 39 feet to allow for easier below-grade loading. The majority of the tower’s base would be activated with either restaurant space, or separate lobbies for residences and offices.

The committee will continue to review the project's design. See the source article for an image gallery and more details.

Tuesday, November 9, 2021 in Urbanize Atlanta

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

The Chicago Avenue Bridge when it was open, a dark red bridge in front of downtown.

Chicago Avenue bridge construction delays enrages city leaders

The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.

5 hours ago - Block Club Chicago

People walk to a bus in Queens

NYC bus network redesign speeds up Queens buses

Rush routes have seen a 4.6% speed increase after the redesign.

6 hours ago - Mass Transit

A rendering of the California high speed rail Fresno station. Two escalators leading into the station are visible.

California High-Speed Rail Authority picks trainset manufacturer

The California High-Speed Rail Authority aims to start servicing passengers by 2033.

7 hours ago - Railway News