Presidio Tunnel Tops Links San Francisco Parks Above Seven Lanes of Traffic

Encompassing 14 acres, the project spans a major parkway and includes a two-acre children’s play area, trails, several overlooks, and gathering spaces from picnic areas to a campfire circle.

1 minute read

July 18, 2022, 11:00 AM PDT

By Clement Lau


People walking on a concrete pathway at Presidio Tunnel Tops with the Golden Gate Bridge in the background

Presidio Tunnel Tops / Presidio Tunnel Tops, San Francisco

Construction of the Presidio Tunnel Tops is a complicated effort that began in 2018. The $98-million project is funded primarily through philanthropic donations raised by the Golden Gate National Parks Conservancy’s capital campaign. The park was designed by James Corner Field Operations, which is best known for New York’s High Line.

With an area of about 14 acres, the project spans over Presidio Parkway, a major highway, and includes miles of underground utilities and infrastructure. It offers a two-acre children’s play area, trails, several overlooks, and gathering spaces from picnic areas to a campfire circle. The project also involves a seismic upgrade to a historic building to serve as the home for Crissy Field Center, two new learning labs, and a public Field Station for youth and their families. Mountains of soil were imported to grow beautiful new gardens planted with nearly 200,000 native and drought-tolerant plants.  

The project will open to the public starting Sunday, July 17, 2022 and is set to become the latest attraction for both residents and visitors to the Bay Area.

Saturday, July 16, 2022 in CNN

Young Professional

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban and Environmental Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban and Environmental Planner

Get top-rated, practical training for planners

"Planetizen federal action tracker" logo superimposed over black and white image of US Capitol dome.

Planetizen Federal Action Tracker

A weekly monitor of how Trump’s orders and actions are impacting planners and planning in America.

October 28, 2026 - Zachary Whalen

A car drives through a puddle, making a large splash. Rain pours down.

California plans to bury El Niño’s downpour

If the state plays its cards right, it may be able to store a billion acre-feet of El Niño’s water in aquifers.

October 28, 2026 - Grist

Lake Powell with much of the water evaporated.

Desperate measures: Advocates weigh draining Lake Powell to fill Colorado River

Draining the reservoir could reduce evaporation losses by a couple hundred thousand acre-feet.

October 30, 2026 - Yale Environment 360

The Chicago Avenue Bridge when it was open, a dark red bridge in front of downtown.

Chicago Avenue bridge construction delays enrages city leaders

The bridge has been closed since 2025. The city originally aimed to re-open it in December, and now expects to finish construction in 2027.

November 1 - Block Club Chicago

People walk to a bus in Queens

NYC bus network redesign speeds up Queens buses

Rush routes have seen a 4.6% speed increase after the redesign.

November 1 - Mass Transit

A rendering of the California high speed rail Fresno station. Two escalators leading into the station are visible.

California High-Speed Rail Authority picks trainset manufacturer

The California High-Speed Rail Authority aims to start servicing passengers by 2033.

November 1 - Railway News