CalTrans

This Labor Day, a 300-ft. section of the east span of the San Francisco Bay Bridge will be cut out and pushed aside, connecting to a new detour that will facilitate the switch from a double-decker configuration to a side-by-side one.
Aug 6, 2009   CalTrans