St. Louis Riverfront Plan Set To Begin

A master plan for the St. Louis riverfront will begin shortly to improve connections with the Mississippi River and downtown St. Louis.
May 3, 2005, 12pm PDT | Abhijeet Chavan
Share Tweet LinkedIn Email Comments

A master plan for the St. Louis central riverfront is set to begin this month to prepare a comprehensive plan to improve connections between downtown St. Louis, the Gateway Arch and the Mississippi River. The 12-month process will include a design for riverfront improvements.

Thanks to Todd Antoine

Full Story:
Published on Thursday, April 28, 2005 in The Kansas City Star
Share Tweet LinkedIn Email